Our process

One team across the entire lifecycle.

The people who assess your facility are connected to the people who install and maintain the equipment so specification, install and service never contradict each other.

Four stages

What happens, in order

Every project follows the same sequence, whether it is a single prep station or a full finishing line.

Eurovac Installation for Aluminum Dust Extraction - Wet Mix

1

Assess

Understand your facility, application, production requirements and goals before any equipment is proposed.

  • N
    Site walk of the building, power, air supply and exhaust paths
  • N
    Parts, throughput and coating chemistry reviewed against cycle time targets
  • N
    Existing equipment evaluated for reuse, retrofit or replacement

2

Design

Recommend equipment and configuration based on your application, throughput, compliance needs and budget.

  • N
    Booth configuration, airflow and air volume sized to the application
  • N
    NFPA 33, OSHA and Florida code requirements addressed in the specification
  • N
    Written scope, drawings and budget so nothing is discovered mid-install

3

Install

Professional installation backed by licensed contracting expertise, coordinated with your trades and schedule.

    • N
      Licensed contracting, permitting support and inspection coordination
    • N
      Phased scheduling that keeps existing production running where possible
    • N
      Mechanical, electrical and controls tie-in handled by one accountable team
    Example of Vacuum Pump Repair Services Offered by Southern Booth and Equipment Florida

    4

    Maintain

    Service and maintenance that keep your investment operating long after the install crew leaves.

    • N
      Commissioning with documented airflow and pressure readings
    • N
      Operator and maintenance training at handover
    • N
      Preventive maintenance, filter service and emergency repair afterward

    What you get

    Documentation that survives an inspection

    Every stage produces something you can hand to a permitting office, an insurer or your own maintenance team.

    Site assessment

    Written findings on airflow, power, exhaust and space constraints.

    Equipment specification

    Model, configuration, airflow data and options, in writing.

    Install package

    Drawings, permit support and an agreed installation schedule.

    Commissioning report

    Verified readings, operator training and a maintenance interval.